Amusement rides

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10576387
APP PUB NO 20180133605A1
SERIAL NO

15571443

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gondola 40 is mounted to move freely along an endless, sinuous track 20. With the track 20 rotating about a horizontal axis, the gondola 40 is raised and, as the track 20 presents a downhill section, the gondola 40 rolls down it under the influence of gravity. The steeper the downhill section, the greater the speed until the gondola 40 reaches its lowermost position (FIG. 1B). Its momentum cause the gondola 40 to carry on travelling along a momentarily uphill section of the track 20. Travel from then on depends on a number of variables, including the rotational speed, direction and acceleration of the track 20, the weight of the gondola 40 and its passengers, the natural damping effect of friction in the mounting of the gondola 40 on the track 20, and any additional braking and/or driving effect that may be applied to the gondola 40. As compared to a conventional rollercoaster, the ride 1 may occupy a very much smaller footprint, incur a much lower capital cost and be readily adaptable to mobile use. By varying the operating parameters, many differing ride experiences may be achieved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PONDORFER WALTER9991 DÖLSACH (TIROL)

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pondorfer, Walter Tirol, AT 6 45

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 3, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 3, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00