Lodged projectile removal charge

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10571212
SERIAL NO

16350088

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process that uses a lodged projectile removal charge (LPRC) apparatus to remove a projectile jammed in a cannon's gun tube. The LPRC is positioned coaxially and offset from the projectile, and the gun tube is filled with water. The charge is detonated producing a shock wave that disintegrates the LPRC apparatus and pressurizes the water. The pressurized water produces a radial hydraulic force against an interior wall of the gun tube, an axial hydraulic force against the projectile pushing the projectile toward the chamber, and produces an opposing expansion of explosive gases that blasts out most of the water in the gun tube. The process is less likely to damage the gun tube. The LPRC may be made using a 3D printer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE UNITED STATES OF AMERICA AS REPRESENTED BY THE SECRETARY OF THE NAVYWASHINGTON DC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Craft, Michael G Waldorf, US 2 2
Diaz, Angel Indian Head, US 16 27
Hubbard, Walter LaPlata, US 1 0
McCarthy, Daniel LaPlata, US 44 570
Rivera, Marchand David Alexandria, US 2 7
Shaker, Nicholas Springfield, US 3 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00