Rolled steel material for fracture splitting connecting rod

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10570487
APP PUB NO 20170292178A1
SERIAL NO

15518035

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rolled steel material for fracture splitting connecting rods consists of, C: 0.30 to 0.40%, Si: 0.60 to 1.00%, Mn: 0.50 to 1.00%, P: 0.04 to 0.07%, S: 0.04 to 0.13%, Cr: 0.10 to 0.30%, V: 0.05 to 0.14%, Ti: more than 0.15% to 0.20% or less, N: 0.002 to 0.020%, and optionally may contain Cu, Ni, Mo, Pb, Te, Ca, and Bi, with the balance being Fe and impurities. fn1, defined by Formula (1), ranges from 0.65 to 0.80. Relative to the V content in the steel material, a V content in coarse precipitates having a particle size of 200 nm or more is 70% or less, and relative to the Ti content in the steel material, a Ti content in the coarse precipitates is 50% or more.

description='In-line Formulae' end='lead'fn1=C+Si/10+Mn/5+5Cr/22+(Cu+Ni)/20+Mo/2+33V/20−5S/7  (1)description='In-line Formulae' end='tail'

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATION6-1 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 1008071 JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hasegawa, Tatsuya Tokyo, JP 54 173
Kawakami, Masashi Wako, JP 26 48
Matsuda, Hideki Wako, JP 102 1026
Miyakoshi, Yusuke Kitakyushu, JP 4 0
Saito, Isamu Wako, JP 13 81
Takasuga, Motoki Kitakyushu, JP 8 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 25, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00