Process of using a plug flow hydrolysis reactor having a slurry introduction device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10563239
APP PUB NO 20170349923A1
SERIAL NO

15538850

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided herein is a process for hydrolyzing a cellulosic feedstock to produce sugar. The process comprises introducing a pretreated cellulosic slurry to an inlet region of a plug flow hydrolysis reactor using a slurry introduction device that reduces the axial momentum of the slurry at the surface of the reactor contents. The cellulosic feedstock slurry is hydrolyzed in the plug flow hydrolysis reactor by contacting the cellulosic feedstock with at least cellulase enzymes to produce glucose. Also provided herein is a vertically-oriented, unmixed downflow hydrolysis reactor for hydrolyzing a pretreated cellulosic feedstock slurry which comprises such a slurry introduction device disposed in a top region thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IOGEN ENERGY CORPORATION310 HUNT CLUB ROAD EAST OTTAWA ONTARIO K1V 1C1

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Castiglione, Lee Ottawa, CA 1 1
Lepine, Stephanie Ottawa, CA 1 1
van, der Meulen Torbjorn Ottawa, CA 5 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00