Systems and methods for forming a composite part based on volume

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10562244
APP PUB NO 20180207891A1
SERIAL NO

15412674

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an example, a method for forming a composite part includes, based on a part specification, cutting layers of material in a sequence and positioning the layers to form a stack. For each layer, after positioning the layer and before cutting a next layer in the sequence, the method includes (i) scanning along a length of the layer to determine an image, (ii) determining, based on the image, at least two edges of the layer, (iii) determining, based on the edges, a measured width at locations along the length of the layer, (iv) comparing the measured width at each location to a target width at the location, (v) deciding, based on the comparison, whether to adjust the production process, and (vi) if the decision is to adjust the production process, then adjusting the production process based on the comparison. The part specification specifies the target width at each location.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY100 NORTH RIVERSIDE PLAZA CHICAGO IL 60606-1596

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Henry, Chelsey Elizibeth Sandy, US 1 1
Larkin, Jeremy Robert West Jordan, US 1 1
Larkin, Kari P West Bountiful, US 3 12
Tat, Hong Hue Seattle, US 20 135
Wu, Yuan-Jye Seattle, US 26 923

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 18, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00