Pipeline system for time-series data forecasting

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10560313
APP PUB NO 20190394083A1
SERIAL NO

16452791

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pipeline system for time-series data forecasting using a distributed computing environment is disclosed herein. In one example, a pipeline for forecasting time series is generated. The pipeline represents a sequence of operations for processing the time series to produce forecasts. The sequence of operations include model strategy operations for applying various model strategies to the time series to determine error distributions corresponding to the model strategies. The sequence of operations further include a model-strategy comparison operation for determining which of the model strategies is a champion model strategy for the plurality of time series based on the error distributions of the model strategies. The pipeline is executed to determine the champion model strategy for the time series.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAS INSTITUTE INCSAS CAMPUS DRIVE CARY NC 27513

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brzezicki, Jerzy Michal Cary, US 11 346
Haley, Timothy Patrick Cary, US 4 42
Helmkamp, Phillip Mark Apex, US 2 28
Pothireddy, Sujatha Apex, US 8 154
Sglavo, Udo Vincenzo Raleigh, US 1 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00