Linear vibration motor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10560010
APP PUB NO 20180278136A1
SERIAL NO

15763286

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A linear vibration motor comprises: a movable element that comprises a magnet portion, a weight portion, and a yoke; a frame for enclosing the movable element; a coil, secured to the frame, for applying a driving force to the magnet portion so as to cause the movable element to undergo reciprocating vibration along the axial direction; and an elastic member for applying, to the movable element, an elastic force that repels the driving force that is applied to the magnet portion, wherein: a magnetic material portion (a magnetic material piece) that extend along the direction of vibration of the movable element is provided on an inner surface of the frame, and the yoke has a raised portion near the magnetic material portion (the magnetic material piece).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIDEC COPAL CORPORATION18-10 SHIMURA 2-CHOME ITABASHI-KU TOKYO 1748550

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishii, Shiori Tokyo, JP 4 31
Katada, Yoshinori Tokyo, JP 22 229
Odajima, Shin Tokyo, JP 11 173
Segawa, Noboru Tokyo, JP 17 202

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00