Unmanned semi-submarine

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10556640
APP PUB NO 20180339748A1
SERIAL NO

15985688

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An unmanned semi-submarine, including a main hull; airfoil buoyancy chambers; an antenna; a radar; a propeller; a rudder; and compartments. The airfoil buoyancy chambers include a front buoyancy chamber and a rear buoyancy chamber. The front buoyancy chamber and the rear airfoil buoyancy chamber are longitudinally distributed on the main hull. The radar and the antenna are disposed on the top end of the front buoyancy chamber. The rudder is disposed on the rear buoyancy chamber. The propeller is disposed at the tail of the main hull to drive the unmanned semi-submarine. The horizontal sections of the front buoyancy chamber and the rear buoyancy chamber are symmetrical airfoil. The compartments include a front equipment compartment, a rear equipment compartment, a control equipment compartment, a battery compartment, and a propelling compartment. The compartments are separated from one another using watertight walls.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DALIAN UNIVERSITY OF TECHNOLOGY116024 NO 2 LING ROAD GANJINGZI DISTRICT LIAONING DALIAN DALIAN LIAONING PROVINCE 116024

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Ming Dalian, CN 541 3163
Guan, Guan Dalian, CN 13 13
Jin, Chaoguang Dalian, CN 5 0
Li, Kai Dalian, CN 391 5044
Lin, Yan Dalian, CN 99 320
Wang, Yunlong Dalian, CN 60 620
Yu, Yanyun Dalian, CN 13 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00