Speed clamp for T-slotted structural elements

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10556326
SERIAL NO

15876787

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A clamp for a T-slotted structural element can be positioned anywhere along the T-slot. A housing and stop are opposingly attached to the structural member, and a horizontal shaft is engaged with the housing. A fixing pin is inserted through a vertical hole in the housing and attached to a slot key that is inserted in the T-slot. Actuating a lever or handle applies an upward force on the fixing pin, pressing the key against the top of the T-slot and fixing the housing in place. In embodiments, the stop can be repositioned to any of a plurality of locations along the T-slot. In certain embodiments, the stop and housing can be placed on different surfaces of the structural member. In various embodiments, the stop and/or housing are constructed with different slot profiles that match their respective T-slotted structural elements. In embodiments, the housing is rotatable.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORTISCLAMP LLC316 DURSTON AVENUE SYRACUSE NY 13203

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kelly, Michael T Syracuse, US 65 1207

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 11, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00