Cross point array type phase change memory device and method of driving the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10553277
APP PUB NO 20180144794A1
SERIAL NO

15815186

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A phase change memory device may include a cross point array and a sensing circuit block. The cross point array may include a plurality of word lines, a plurality of bit lines and phase change memory cells. The word lines and the bit lines may intersect each other. The phase change memory cells are positioned at intersection points between the word lines and the bit lines. The sensing circuit block reads data in the phase change memory cells. The sensing circuit block may include a first sensing unit and a second sensing unit. The first sensing unit senses the data using a first voltage. The second sensing unit senses the data using a second voltage, which may be higher than a threshold voltage of the phase change memory cell, when the data in the phase change memory cell read by the first sensing unit is determined to be abnormal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SK HYNIX INCGYEONGGI DO SOUTH KOREA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, In Soo Icheon-si, KR 12 58

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 4, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00