Use of C4 absorber overhead for stripping aldehydes

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10538466
APP PUB NO 20180258015A1
SERIAL NO

15968909

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process is presented for the production of butadienes. The process includes the separation of oxygenates from the product stream from an oxidative dehydrogenation reactor. The process includes quenching the product stream and solvent and oxygenates from the product stream. The oxygenates are stripped from the solvent with an inert gas to reduce the energy consumption of the process, and the solvent is recycled and reused in the process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UOP LLC25 EAST ALGONQUIN ROAD SUITE 2500 DES PLAINES IL 60017
TPC GROUP LLC5151 SAN FELIPE SUITE 800 HOUSTON TX 77056

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Blommel, Jeannie M Oregon, US 1 0
Duff, Joseph G League City, US 17 26
Horn, Jillian M Decatur, US 8 12
Luebke, Charles P Mount Prospect, US 82 508
Maat, Clifford A Pearland, US 6 1
Nutt, Michael O Pearland, US 17 58
Senetar, John J Naperville, US 85 599
Sullivan, Dana K Mount Prospect, US 12 104

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 21, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 21, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00