Power conversion system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10538162
APP PUB NO 20170361711A1
SERIAL NO

15624267

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power conversion system includes an AC to DC conversion circuit, a voltage detector, a step-down chopper circuit, a power conversion device for auxiliary power sources, and a control unit. The AC to DC conversion circuit converts AC power supplied from overhead wires via a transformer into DC power. The voltage detector detects a voltage of AC power supplied from the transformer. The step-down chopper circuit steps down the voltage of DC power produced through conversion by the AC to DC conversion circuit. The power conversion device for auxiliary power sources converts the DC power stepped down by the step-down chopper circuit into power for driving loads mounted in an electric vehicle and supplies it to the loads. The control unit controls the AC to DC conversion circuit and the step-down chopper circuit such that the voltage of AC power detected by the voltage detector approaches a reference voltage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOSHIBA INFRASTRUCTURE SYSTEMS & SOLUTIONS CORPORATION72-34 HORIKAWA-CHO SAIWAI-KU KAWASAKI-SHI KANAGAWA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujita, Tsunehito Fuchu, JP 8 11
Fukushima, Takafumi Nagoya, JP 36 238
Kikkawa, Kenichi Saitama, JP 4 13
Maki, Yasuomi Fuchu, JP 6 25
Mori, Manato Kawasaki, JP 5 12
Oda, Kotaro Nagoya, JP 9 11
Okada, Shigekazu Nagoya, JP 5 11
Otani, Hiroaki Fuchu, JP 12 41

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 21, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 21, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00