Apparatus for manufacturing iron core for rotating electric machine

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10536059
APP PUB NO 20160294260A1
SERIAL NO

15184199

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The apparatus for manufacturing an iron core for a dynamo-electric machine according to an embodiment of the present invention is provided with a rotary layering part for layering while rotating an iron core material punched from an electromagnetic steel sheet, a drive source for generating a drive force for rotating the rotary layering part, and a drive force transmission part for transmitting the drive force generated by the drive source to the rotary layering part. The drive force transmission part is configured from a plurality of gears arranged between the drive source and the rotary layering part. The rotary layering part is provided with a rotation position establishing means for establishing the rotation position of the rotary layering part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOSHIBA INDUSTRIAL PRODUCTS AND SYSTEMS CORPORATION580 HORIKAWA-CHO SAIWAI-KU KAWASAKI-SHI KANAGAWA 212-0013

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akatsuka, Takayuki Mie, JP 5 11
Fujita, Naoya Mie, JP 27 65
Ihori, Masanori Mie, JP 1 0
Yamada, Toyonobu Mie, JP 14 256

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00