Piezoelectric film and process for producing same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10535811
APP PUB NO 20180097171A1
SERIAL NO

15563739

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A piezoelectric film which is better in heat and deformation resistant properties than those in the prior art is provided along with a method of manufacture. The film is a piezoelectric film that is composed of a copolymer of vinylidene fluoride and trifluoroethylene, the copolymer having a content of vinylidene fluoride in a range of not less than 82 mol % and not more than 86 mol % and having a molecular weight not less than 600,000. The piezoelectric film is subjected to a heat treatment for crystallization of the copolymer at a temperature ranging from not less than 140° C. to not more than 150° C., and is thereby caused to develop piezoelectric property. The piezoelectric film further has a heat resistance of not less than 140° C. and a breaking distortion of not less than 8% and not more than 55%, and an excellent deformation resistant property.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHEMITRONICS CO LTD2-703 TATENO HIGASHIYAMATO-SHI TOKYO 2070021

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ohigashi, Hiroji Miyagi, JP 13 337
Omote, Kenji Miyagi, JP 73 1271
Samezawa, Tsurugi Miyagi, JP 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00