Polymeric film coating method on a substrate by depositing and subsequently polymerizing a monomeric composition by plasma treatment

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10533114
APP PUB NO 20160122585A1
SERIAL NO

14893256

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for coating a substrate comprising the following steps: a) depositing a polymerizable composition on said substrate, the composition being selected from the following compositions:

    a composition (A) containing, as an essential component: a least one epoxy monomer (i) and/or at least one silicone epoxy monomer (ii); ora composition (B) containing as an essential component a least one silicone epoxy monomer (ii) and at least one monomer containing at least one ethylenic unsaturation (iii); b) polymerizing said composition by plasma treatment. The coating obtained with this method is substantially free from ionic photocatalysts, and the step (b) is carried out at atmospheric pressure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIVERSITA' DEGLI STUDI MILANO-BICOCCAPIAZZA DELL' ATENEO NUOVO 1 MILANO I-20126

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Riccardi, Claudia Milan, IT 5 7
Tassetti, Dario Sorisole, IT 1 2
Zanini, Stefano Varedo, IT 7 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 14, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 14, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00