Power distribution systems

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10530152
APP PUB NO 20180191156A1
SERIAL NO

15741771

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power distribution system has a power converter with a plurality of semiconductor switching devices per phase, a PWM controller, and a current limitation controller. The current limitation controller is adapted, at least when a short-circuit fault is detected, to calculate the difference between a measured current for each phase and a reference current for the corresponding phase. If the calculated difference is located outside a predetermined current range centered about the reference current for the corresponding phase, the current limitation controller will allow the semiconductor switching devices of the corresponding phase to be turned on and off by the PWM controller. Otherwise, if the calculated difference is located inside the predetermined current range, the current limitation controller will control the semiconductor switching devices for the corresponding phase to be turned off irrespective of the PWM control strategy applied by the PWM controller.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE ENERGY POWER CONVERSION TECHNOLOGY LIMITEDTHOMSON HOUSTON WAY OFF TECHNOLOGY DRIVE RUGBY CV21 1BD

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Long, Teng Rugby, GB 26 70
Mupambireyi, Ushindibaba Rugby, GB 3 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00