Nonaqueous electrolyte secondary battery

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10529978
APP PUB NO 20180108939A1
SERIAL NO

15554982

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

It is an object of the present invention to provide a nonaqueous electrolyte secondary battery improved in output after storage in a charged state. An embodiment of the present invention provides a nonaqueous electrolyte secondary battery including an electrode assembly having a structure in which a positive plate and a negative plate are stacked with a separator therebetween. The positive plate contains tungsten and a phosphate compound. The negative plate contains a graphitic carbon material as a negative electrode active material and a noncrystalline carbon material stuck on the surface thereof. The negative plate contains tungsten or a tungsten compound on the surface of the noncrystalline carbon material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC ENERGY CO LTD1-1 MATSUSHITA-CHO MORIGUCHI-SHI OSAKA 5708511 ?5708511

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukui, Atsushi Hyogo, JP 273 2424
Higuchi, Takatoshi Hyogo, JP 13 24
Isono, Takahiro Hyogo, JP 27 251

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00