Methods of fabricating a SiOCN layer using a first and second carbon precursor, the first carbon precursor being different from the second carbon precursor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10529555
APP PUB NO 20190287797A1
SERIAL NO

16422375

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of forming a SiOCN material layer, a material layer stack, a semiconductor device, a method of fabricating a semiconductor device, and a deposition apparatus, the method of forming a SiOCN material layer including providing a substrate; providing a silicon precursor onto the substrate; providing an oxygen reactant onto the substrate; providing a first carbon precursor onto the substrate; providing a second carbon precursor onto the substrate; and providing a nitrogen reactant onto the substrate, wherein the first carbon precursor and the second carbon precursor are different materials.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTD129 SAMSUNG-RO YEONGTONG-GU SUWON-SI GYEONGGI-DO 16677 16677

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Sung-hyun Suwon-si, KR 24 372
Koo, Bon-young Suwon-si, KR 67 1200
Lee, Tae-jong Hwaseong-si, KR 22 338
Park, Ki-yeon Hwaseong-si, KR 55 737
Tak, Yong-suk Seoul, KR 44 673

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00