Hydraulic circuit device and line pressure boosting method for hydraulic circuit

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10527113
APP PUB NO 20180283477A1
SERIAL NO

15915063

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydraulic circuit device for a vehicle, includes a clutch, a flow path, a fluid pump, a pressure generating device, and a control valve. The control valve is configured to determine whether a transmission start-stop function activation condition other than a vehicle speed is satisfied, determine whether a system start-stop function activation condition related to a component of the vehicle is satisfied, the component being other than the transmission, determine whether the vehicle speed is equal to or lower than a first speed threshold, and boost a line pressure of the flow path to accumulate pressure in the pressure generating device for preparing activation of the start-stop function if it is determined that the transmission start-stop function activation condition and the system start-stop function activation condition are satisfied, and if it is determined that the vehicle speed is equal to or lower than the first speed threshold.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONDA MOTOR CO LTDTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tachibanada, Yuya Wako, JP 36 101

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00