Internal combustion engine/generator with pressure boost

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10527007
APP PUB NO 20160377030A1
SERIAL NO

14754060

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This invention relates to improvements in internal combustion engines. More particularly it relates to increased levels of usable electrical energy production and fuel efficiency within a relatively fixed speed, cam-track style Engine/Generator when combined with the secondary injection or injections of a rapidly expanding medium (usually water) into the engines combustion chambers during and after the combustion process has been initiated. The injection of said medium causing reduced fuel consumption, increased cylinder pressure, an extended usable piston stroke length, and increased usable energy production, while reducing the temperature of the combustion gases in order to control or eliminate the production of the pollutant, NOx and to further reduce thermal pollution exhausted into the atmosphere.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RUSSELL ENERGY CORPORATION979 WALNUT RIDGE COURT FRANKFORT IL 60423

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Russell, Robert L Frankfort, US 36 533

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00