Method for manufacturing steel for high-strength hollow spring

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10526675
APP PUB NO 20170306432A1
SERIAL NO

15520616

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing steel, by quenching and tempering a seamless pipe for use as a material of a hollow spring, where the seamless pipe including predetermined components is subjected to a heat treatment which is performed to satisfy quenching conditions (1) and tempering conditions (2),

    (1) quenching conditions:26,000≤(T1+273)×(log(t1)+20)≤29,000900° C.≤T1≤1,050° C.,10 seconds≤t1≤1,800 seconds,  formula (1)where T1 is a quenching temperature (° C.), and t1 is a holding time (seconds) in a temperature range of 900° C. or higher, and(2) tempering conditions:13,000≤(T2+273)×(log(t2)+20)≤15,500T2≤550° C., andt2≤3,600 seconds,  formula (2)where T2 is a tempering temperature (° C.), and t2 is a total time (seconds) from start of heating to completion of cooling.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NHK SPRING CO LTD3-10 FUKUURA KANAZAWA-KU YOKOHAMA-SHI KANAGAWA 2360004

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goto, Yurika Yokohama, JP 10 47
Hatano, Hitoshi Kobe, JP 12 433
Kochi, Takuya Kobe, JP 31 118
Kurimoto, Kiyoshi Yokohama, JP 11 75
Tange, Akira Yokohama, JP 181 2214

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00