Blast furnace and method for operating a blast furnace

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10526670
APP PUB NO 20160083810A1
SERIAL NO

14955105

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present blast furnace and method for operating a blast furnace are able to reduce CO2 production and the amount of applied additives and heating material. The method for metal production of metal ores comprising the following steps: reducing a metal ore, particularly a metal oxide, and thereby producing furnace gas containing CO2 in a blast furnace shaft; discharging the furnace gas from the blast furnace shaft; directing at least a portion of the furnace gas into a CO2 converter and reducing the CO2 in the furnace gas into CO; directing at least a portion of the CO from the CO2 converter into the blast furnace shaft. The method produces CO as a gaseous reduction agent which may be easily introduced into the blast furnace shaft. Further, a blast furnace for metal production by reducing a metal ore designed for operating according to the method is described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CCP TECHNOLOGY GMBH81667 MÜNCHEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kuhl, Olaf Greifswald, DE 12 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00