Conversion of biomass into methane

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10526555
APP PUB NO 20180273864A1
SERIAL NO

15762374

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing methane from a biomass, biomass-containing and/or biomass-derived feedstock is provided. The process comprises:

    a) providing in a hydropyrolysis reactor vessel a hydropyrolysis catalyst composition, said composition comprising one or more active metals supported on an oxide-based support, said one or more active metals comprising at least one of cobalt and nickel and said one or more active metals being present in total in an amount in the range of from 2 to 75 wt % based on the overall weight of the catalyst composition;b) contacting the feedstock with said hydropyrolysis catalyst composition and molecular hydrogen in said hydropyrolysis reactor vessel, to produce a first product stream comprising char, catalyst fines and gases comprising hydrogen and hydrocarbons, of which hydrocarbons at least 70 wt % is methane and, optionally, CO and CO2; andc) removing said char and catalyst fines from said first product stream.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHELL OIL COMPANYP O BOX 576 HOUSTON TX 77001-0576

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chilkoor, Soundararajan Laxmi Narasimhan Bengaluru, IN 15 24
Mehta, Dhairya Dilip Bengaluru, IN 4 7
Panchagnula, Madhusudhan Rao Bengaluru, IN 12 20
Urade, Vikrant Nanasaheb Bengaluru, IN 18 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00