Power tool

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10525577
APP PUB NO 20180147709A1
SERIAL NO

15817517

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power tool includes a housing, a prime mover disposed in the housing, a first cylinder formed with a first chamber, a first rotating member rotatable with respect to the first cylinder about a first axis under the driving of the prime mover, a first piston movable in a direction parallel to the first axis when the first rotating member rotates relative to the first cylinder. The first cylinder and the first rotating member are disposed within the housing. The first piston is disposed within the first chamber The first rotating member is formed with a first transmission structure to drive the first piston The first piston is formed with a second transmission structure capable of cooperating with the first transmission structure to rotate the first rotation member to drive the first piston.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NANJING CHERVON INDUSTRY CO LTDNO 529 JIANGJUN ROAD JIANGNING ECONOMIC AND TECHNICAL DEVELOPMENT ZONE NANJING JIANGSU 211106 211106

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hao, Jingdong Nanjing, CN 7 15
Masatoshi, Fukinuki Nanjing, CN 8 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00