Criterion for sequential update

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10521516
SERIAL NO

14835304

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for designing a 3D modeled object can implement a modeling graph having nodes that represent geometrical objects and arcs that each represent a relationship, wherein procedural relationships are represented by unidirectional arcs, wherein the relationships linking the geometrical objects further include live relationships that are represented by bidirectional arcs, and wherein the provided modeling graph respects a criterion that all the arcs of each strong component of the modeling graph are bidirectional. Upon adding a relationship linking two of the geometrical objects that are included in the data defining the 3D modeled object before the addition, the method selects two geometrical objects to be linked by the relationship to be added, the selection being performed according to the criterion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DASSAULT SYSTEMESFRENCH VELIZY - VERAKU BLIGH VELIZI VEE LAKU BLY EVELYN PROVINCE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rameau, Jean-Francois Lisses, FR 16 162

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00