Turbine frame and bearing arrangement for three spool engine

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10519860
SERIAL NO

15451498

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure is directed to a gas turbine engine defining a radial direction, a circumferential direction, an axial centerline along a longitudinal direction. The gas turbine engine defines an upstream end and a downstream end along the longitudinal direction and includes a turbine frame defined around the axial centerline. The turbine frame includes a first bearing surface, a second bearing surface, and a third bearing surface. The first bearing surface corresponds to a first turbine rotor, the second bearing surface corresponds to a second turbine rotor, and the third bearing surface corresponds to a third turbine rotor, and each turbine rotor is independently rotatable.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL ELECTRIC COMPANY1 RIVER ROAD SCHENECTADY NY 12345

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Clements, Jeffrey Donald Mason, US 66 713
Miller, Brandon Wayne Liberty Township, US 231 2428
Moniz, Thomas Ory Loveland, US 131 3948
Stuart, Alan Roy Cincinnati, US 47 447
Zatorski, Darek Tomasz Fort Wright, US 94 852

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00