Movement with power reserve extension

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10514659
SERIAL NO

15887375

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A timepiece movement is provided, including a first regulating member and a first escapement connected by a first train to a first energy source, where the first train, the first escapement, the first regulating member, and the first energy source together define a first assembly; a second regulating member and a second escapement connected by a second train to a second energy source, where the second train, the second escapement, the second regulating member, and the second energy source together define a second assembly; at least one differential gear configured to ensure a kinematic connection between the first and the second assemblies; a display of the current time; and a mechanism for stopping and allowing operation of one of the regulating members, where the differential gear carries the display to display the current time regardless of which of the regulating members is operating.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE SWATCH GROUP RESEARCH AND DEVELOPMENT LTDSWISS MA LIN MARIN-EPAGNIER NEUCHATEL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bazin, Jean-Luc Tuscherz-Alfermee, CH 25 50
Bravo, Paulo Marin-Epagnier, CH 19 53

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00