Lignocellulosic conversion process comprising sulfur dioxide and/or sulfurous acid pretreatment

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10513714
SERIAL NO

15550515

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided herein is a process for producing one or more products from a lignocellulosic feedstock. The process comprises treating the lignocellulosic feedstock by contacting the feedstock at least sulfur dioxide, sulfurous acid, or a combination thereof to produce a pretreated feedstock comprising one or more sulfonic acids. A process stream comprising one or more sulfonic acids is subsequently treated in a wet oxidation step to produce a stream comprising at least soluble oxidized phenolic compounds. The soluble oxidized phenolic compounds are then fed to an anaerobic digestion to produce methane. Optionally, hydrogen sulfide is produced during the anaerobic digestion. The hydrogen sulfide may then be converted to an acid selected from sulfur dioxide, sulfurous acid or a combination thereof in one or more steps. The acid may then be re-used in treatment as desired.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IOGEN CORPORATION310 HUNT CLUB ROAD EAST SUITE 101 OTTAWA ONTARIO K1V 1C1

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Foody, Brian Ottawa, CA 79 1358
Tolan, Jeffrey S Ottawa, CA 46 1077

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 24, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00