Power circuit, iron core for Scott connected transformer, Scott connected transformer, and superheated steam generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10510480
APP PUB NO 20170179840A1
SERIAL NO

15452408

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention allows individual control of an output voltage of a main transformer and an output voltage of a teaser transformer while utilizing output characteristics of the respective transformer when a Scott connected transformer has control equipment arranged on the input side thereof, including first control equipment arranged in one of two phases of the main transformer on the input side in order to control a voltage or a current and second control equipment arranged in one end of a primary coil of the teaser transformer on the input side in order to control a voltage or a current, the control equipment controlling an output voltage of the main transformer and an output voltage of the teaser transformer individually.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOKUDEN CO LTDKYOTO-SHI KYOTO 607-8345

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujimoto, Yasuhiro Kyoto, JP 43 143
Tonomura, Toru Otsu, JP 31 72

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 17, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 17, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00