Rotary jet, power generation systems and motors including the same, and methods of making and using the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10508544
SERIAL NO

15227846

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rotary device (e.g., a rotary jet), power generation system, and methods of manufacturing and using the same are disclosed. The rotary jet includes a central axle or shaft, an inlet configured to receive at least one fluid, and a plurality of radial arms in fluid communication with the inlet, configured to rotate around the central axle or shaft. Each radial arm has a nozzle at a distal end thereof and an arc between the inlet and the nozzle. The radial arms extend radially from the central axle or shaft at least in part, and are configured to rotate when the fluid enters the inlet and passes through the radial arms, or when a rotational force is applied to the central axle or shaft. Each nozzle may have an opening facing away from a direction of rotation of the radial arms or facing in a direction parallel with the central axle or shaft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LEE BRENT WEI TEHNot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Brent Wei-Teh Saratoga, US 10 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 17, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 17, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00