Bicycle hub assembly

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10507690
SERIAL NO

16381065

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bicycle hub assembly comprises a hub axle, a hub body, and a sprocket support body. The hub body includes a first spoke-mounting portion, a second spoke-mounting portion, and a first axial length. The first axial length is defined between a first axially outermost part of the first spoke-mounting portion and a second axially outermost part of the second spoke-mounting portion in an axial direction and is equal to or larger than 55 mm. The sprocket support body includes a plurality of external spline teeth. The plurality of external spline teeth includes a plurality of external-spline driving surfaces. The plurality of external-spline driving surfaces each includes a radial length defined from a radially outermost edge to a radially innermost edge. A total of the radial lengths of the plurality of external-spline driving surfaces is equal to or larger than 7 mm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHIMANO INCOSAKA JAPAN OSAKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujita, Hiroshi Sakai, JP 287 3126
Koshiyama, Kazuki Sakai, JP 43 429
Nakanishi, Takashi Sakai, JP 105 842

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 17, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 17, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00