Process and device for introducing additive materials in a receptacle at the area of highest pressure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10507594
APP PUB NO 20160101540A1
SERIAL NO

14845221

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and a device for introducing and/or adding non-dry-powder additive materials and/or coating materials with a liquid, solid, semi-solid, or paste-like consistency or in suspended or emulsified form, for example, peroxides, fats, waxes, IV improvers, polymers, or similar materials, to an existing lumpy or particulate material which is moved and mixed, and optionally warmed and reduced to small pieces in a receptacle and/or compressor, said material being in particular polymer particles and/or flakes, wood fibers, paper cuttings, or similar materials. According to the invention, the additive material is introduced below the level of the material and/or material particles already in the receptacle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EREMA ENGINEERING RECYCLING MASCHINEN UND ANLAGEN GESELLSCHAFT M B HANSFELDEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Feichtinger, Klaus Linz, AT 48 497
Hackl, Manfred Ansfelden, AT 42 406
Wendelin, Gerhard Linz, AT 23 221

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 17, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 17, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00