Bi-directional oil-flow adapter for attaching to a valve-controlled port of a transformer

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10495622
SERIAL NO

15250162

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Certain embodiments of the disclosure relate to a bi-directional oil-flow adapter that is attachable to a valve-controlled port of a transformer housing in which oil is contained for cooling parts of the transformer such as a primary coil and a secondary coil. The bi-directional oil-flow adapter not only allows for an oil sample to be drawn out of the transformer housing via the valve-controlled port but also allows for the oil sample to be used (along with an additional volume of oil if so desired) for flushing the valve-controlled port in order to ensure that a subsequent oil sample is different than a current oil sample. The oil sample can be provided to a dissolved gas analyzer for detecting and analyzing one or more gases that may be present in the oil sample, the one more gases indicative of a level of contamination of the oil sample.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL ELECTRIC TECHNOLOGY GMBHBROWN BOVERI STRASSE 7 BADEN 5400

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
McGregor, Alan Lisburn, GB 3 10
Robinson, David Peter Lisburn, GB 9 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 3, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 3, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00