Coolant passage device for internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10494987
SERIAL NO

15756434

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A coolant passage device 3 includes coolant intake pipes 11 and 12 that take in coolant from an engine, a delivery pipe 17 to a radiator communicating with the coolant intake pipes, and a delivery pipe 18 to the heater core branched from a central passage 16 connecting the coolant intake pipes with the delivery pipe to the radiator. A branch port 18a leading to the delivery pipe 18 to the heater core is opened in an upper portion in the central passage 16 in a state where the coolant passage device 3 is mounted to the engine, and the branch port 18a has a wall surface 21 surrounding the branch port and hanging down into the central passage 16. The wall surface 21 prevents bubbles contained in the coolant from entering the branch port 18a. And the coolant passage device consequently prevents coolant flow noise from occurring.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTACHO TOYOTA-SHI AICHI 4718571 ?4718571
NIPPON THERMOSTAT CO LTD59-2 NAKAZATO 6-CHOME KIYOSE-SHI TOKYO 204-0003

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inoue, Fujio Tokyo, JP 50 1668
Koyama, Hiroyasu Toyota, JP 45 262
Tsukamoto, Daisuke Tokyo, JP 12 109

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 3, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 3, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00