Additive manufacturing of conformal deicing and boundary layer control surface for aircraft

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10494107
SERIAL NO

15397552

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multilayer structure for deicing an aircraft airfoil component includes an electrically and thermally insulating bottom layer formed in a defined pattern directly on the aircraft airfoil component, an electrothermal middle layer of electrically resistant heater element arrays formed in the defined pattern on the electrically and thermally insulating bottom layer, and a thermally conductive and electrically insulating top layer encapsulating the electrically and thermally insulating bottom layer and the electrothermal middle layer of electrically resistant heater element arrays. The multilayer structure may be directly applied to the airfoil component by direct writing/additive manufacturing, and may be done with the assistance of a multi-axis robot.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GOODRICH CORPORATION2730 WEST TYVOLA ROAD FOUR COLLSEUM CENTRE CHARLOTTE NC 28217

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dardona, Sameh South Windsor, US 59 215
Garofano, Jacquelynn K M Prospect, US 2 4
Lin, Ray-Sing Glastonbury, US 7 65
Piech, Marcin East Hampton, US 57 109
Schmidt, Wayde R Pomfret Center, US 228 1725
Sheedy, Paul Bolton, US 124 335

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 3, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 3, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00