Identifying and presenting related electrical power distribution system events

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10489019
APP PUB NO 20180364874A1
SERIAL NO

15625554

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods to determine events that are associated with one another. Reports of a first, second, and third events are received. Based upon data associated with the first and second event, a determination is made that the first event is associated with the second event. Based upon data associated with the first event and the third event, a determination is made that the first event is not associated with the third event. A presentation is created indicating that the first and second events are related to the second event and that the first and third events are not related. The presentation is presented to a different process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FLORIDA POWER AND LIGHT COMPANY700 UNIVERSE BOULEVARD JUNO BEACH FL 33408

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Capute, Ronald A Juno Beach, US 8 25
Gomez, Andres Juno Beach, US 6 18
Gonzalez, Michael A Juno Beach, US 18 102
Hayes, Alexandra J Juno Beach, US 4 7
Herazo, Giovanni Juno Beach, US 4 8
Herlong,, II David L Juno Beach, US 4 12
Kansakar, Prashant R Juno Beach, US 3 7
Schwartz, Eric D Juno Beach, US 31 1645
Seppy, Carmen J Juno Beach, US 4 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00