Method for producing a covering element made from fibers impregnated with bitumen having improved fire properties, and composition

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10487509
APP PUB NO 20160356046A1
SERIAL NO

15115072

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a covering element made from natural fibres, in particular cellulose, impregnated with bitumen, includes a step of coating at least one of two faces of a fibre mat (4) followed by a step of impregnating with bitumen, the coating being carried out with a liquid composition (5) including at least one resin and/or at least one pigment. The liquid composition is a dye composition including at least one pigment and at least one resin, and the method involves adding an additive to the liquid composition (5), the additive having fireproof properties and including at least graphite and a cooling agent. Preferably, the mat (4) is coated with the liquid composition including the fireproof additive using a roller.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ONDULINE92150 SURESNES

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guzel, Andac Levallois-Perret, FR 1 0
Sakioglu, Ethem Istanbul, TR 2 1
Tokdemir, Eyup Izmit, TR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00