Composition for transarterial chemoembolization, comprising first and second biodegradable microbeads, and preparation method therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10485763
APP PUB NO 20170165202A1
SERIAL NO

15310281

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides: a composition for transarterial chemoembolization, comprising two types of biodegradable microbeads having different anticancer drug release characteristics; and a preparation method therefor. According to the present invention, a composition for transarterial chemoembolization exhibiting a desired anticancer drug release characteristic can be effectively prepared by controlling the mixing ratio of first and second biodegradable microbeads. Therefore, the present invention can be usefully applied to the transarterial chemoembolization of liver cancer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UTAH-INHA DDS & ADVANCED THERAPEUTICS RESEARCH CENTERB-403 SONGDO TECHNOPARK MICHUHOL TOWER EXTENSION 12 GAETBEOL-RO YEONSU-GU INCHEON 406-840

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Se Yoon Gyeonggi-do, KR 16 38
Lee, Don Haeng Seoul, KR 15 66
Li, Yixian Incheon, KR 8 5
Park, Young Hwan Gangwon-do, KR 135 1606

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 26, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00