Steel part

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10480554
APP PUB NO 20190271342A1
SERIAL NO

16414857

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A formed steel part includes a first steel plate having a first base, a first intermetallic alloy layer on the first base and a first metal alloy layer on the first intermetallic alloy layer, the first steel part having a first area without the first metal alloy layer and having at least part of the first intermetallic alloy layer; and a second steel plate having a second base, a second intermetallic alloy layer on the second base and a second metal alloy layer on the second intermetallic alloy layer, the second steel part having a second area without the second metal alloy layer and having at least part of the second intermetallic alloy layer in the second area. The first and second steel plates are joined together. The formed steel part may also include a butt-weld joining the first and second steel plates.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ARCELORMITTAL FRANCE93200 SAINT DENIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Canourgues, Jean-Francois Nogent sur Oise, FR 13 161
Ehling, Wolfram Ghent, BE 27 249
Pic, Aurelien Paris, FR 14 165
Thommes, Bernd Okemos, US 13 161
Verrier, Pascal Lumbres, FR 16 180
Vierstraete, Rene Maisons-Laffitte, FR 19 191

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 19, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00