Organic Rankine cycle based conversion of gas processing plant waste heat into power and cooling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10480352
APP PUB NO 20190017418A1
SERIAL NO

16118952

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system includes a waste heat recovery heat exchanger configured to heat a heating fluid stream by exchange with a heat source in a crude oil associated gas processing plant; and an Organic Rankine cycle energy conversion system. The Organic Rankine cycle energy conversion system includes a heat exchanger configured to heat a first portion of a working fluid by exchange with the heated heating fluid stream; and a cooling subsystem including one or more cooling elements each configured to cool one or more of a process stream from the crude oil associated gas processing plant and a cooling water stream for ambient air cooling by exchange with a second portion of the working fluid. The Organic Rankine cycle energy conversion system includes an ejector configured to receive the second portion of the working fluid from the cooling subsystem and a third portion of the working fluid; a turbine and a generator configured to generate power by expansion of a fourth portion of the working fluid; and a cooling element configured to cool a stream of working fluid including an output stream of working fluid from the ejector and the expanded fourth portion of the working fluid from the turbine and generator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANY1 EASTERN AVENUE DHAHRAN 31311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kamel, Akram Hamed Mohamed Dhahran, SA 61 395
Noureldin, Mahmoud Bahy Mahmoud Dhahran, SA 87 657

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 19, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00