Method to control the combustion of a compression ignition internal combustion engine with reactivity control through the injection temperature

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10473054
APP PUB NO 20180340486A1
SERIAL NO

15743170

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Method to control the combustion of a compression ignition engine with reactivity control through the injection temperature; the control method provides for the steps of: establishing a quantity of fuel to be injected into a cylinder; injecting a first fraction of the quantity of fuel fed by a first feed system without active heating devices, preferably equal to at least 70% of the quantity of fuel, at least partially during the intake and/or compression stroke; injecting a second fraction of the quantity of fuel fed by a second feed system provided with at least one active heating device, and equal to the remaining fraction of the quantity of fuel, into the cylinder at the end of the compression stroke and preferably at no more than 60° from the top dead center; and heating the second fraction of the quantity of fuel to an injection temperature of over 100° C., before injecting the second fraction of the quantity of fuel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MARMOTORS S R L52100 AREZZO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Marmorini, Luca Arezzo, IT 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 12, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00