Recovering base oil from contaminated invert emulsion fluid for making new oil-/synthetic-based fluids

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10465126
APP PUB NO 20160376509A1
SERIAL NO

15189665

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Base oil can be recovered from contaminated O/SBF by combining a chemical process with a mechanical process. The chemical treatment includes adding a demulsifier, an anionic surfactant, a non-ionic surfactant and/or a mutual solvent to the contaminated O/SBF in an amount effective to separate the base oil from the contaminated O/SBF fluid followed by mechanical separation of oil from water, and optionally from any solids present. The recovered base oil (i.e. conventional drilling fluid, conductive drilling fluid and constant rheology drilling fluid, etc.) may then be reformulated to make a new OBM of the same type from which the base oil was recovered, or as a fuel for engines.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAKER HUGHES A GE COMPANY LLC17021 ALDINE WESTFIELD ROAD HOUSTON TX 77073

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Darugar, Qusai A Houston, US 13 34
Dye, Billy M Cypress, US 1 0
Hussain, Ibraheem T The Woodlands, US 2 0
McCray, Melissa V Houston, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 5, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 5, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00