Production method for carbon nanotubes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10464814
APP PUB NO 20180105424A1
SERIAL NO

15836920

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention shows a production apparatus for producing carbon nanotubes by the gas-phase catalysis process, comprising: a first chamber having a growth region that is a region in which carbon nanotubes are formed; a first temperature adjustment device capable of adjusting a temperature of the growth region in the first chamber; a pressure adjustment device capable of adjusting a pressure in the first chamber; a first feed device capable of feeding a carbon source to the growth region in the first chamber; a second temperature adjustment device capable of adjusting a temperature of a solid-phase iron family element-containing material disposed in the production apparatus; and a second feed device capable of feeding a gas-phase halogen-containing substance into the production apparatus so that the iron family element-containing material of which the temperature is adjusted to a predetermined temperature by the second temperature adjustment device can react with the halogen-containing substance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NATIONAL UNIVERSITY CORPORATION SHIZUOKA UNIVERSITYSHIZUOKA SHIZUOKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inoue, Yoku Shizuoka, JP 11 42
Nakanishi, Tauto Chiba, JP 8 15
Nakano, Takayuki Shizuoka, JP 79 597

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 5, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 5, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00