Measuring device for measuring a mass flow composed of bulk material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10462967
APP PUB NO 20180084720A1
SERIAL NO

15718402

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A measuring device is provided for measuring a mass flow composed of bulk material, in particular grain, in a continuous, circulating conveyor enclosed in part by a housing, having planar conveyor elements, which conveys the bulk material from a lower bulk material receiving area to a higher bulk material delivery area. A substantially circular movement course is imposed on the bulk material delivered by the respective conveyor element in a substantially radial direction of an inner surface of a cover section of the housing by a guide surface formed in the upper region of the conveyor. The bulk material is deflectable toward a sensor surface of the measuring device. At least the sensor surface of the measuring device is disposed in the upper region of the conveyor such that there is a tangential course in the transition from the guide surface to the sensor surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CLAAS SELBSTFAHRENDE ERNTEMASCHINEN GMBHHARSEWINKEL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brandmeier, Jonas Harsewinkel, DE 4 14
Koitzsch, Roger Helmut Bielefeld, DE 2 4
Quincke, Gunnar Soest, DE 6 299

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 5, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 5, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00