Production method for hematite for iron production

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10457565
APP PUB NO 20180037470A1
SERIAL NO

15724624

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a production method for refining iron oxide (hematite), which has such a low sulfur content as to be used as a raw material for ironmaking from a leach residue containing iron oxide, the leach residue being produced by a high pressure acid leach (HPAL) process and being a raw material that can be cheaply and stably procured. In the method of producing (high purity) hematite for ironmaking by a process of adding an oxidant and sulfuric acid to nickel oxide ore and then leaching nickel, a leach residue obtained after the leaching of nickel is heated to 600° C. or more, and preferably 800° C. or more and 1400° C. or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO METAL MINING CO LTDTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kan, Yasumasa Minato-ku, JP 13 21
Mitsui, Hiroyuki Minato-ku, JP 71 750
Sasaki, Hideki Minato-ku, JP 116 1174

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00