Bamboo railroad tie manufacturing system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10456959
APP PUB NO 20160208441A1
SERIAL NO

15003698

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for crafting railroad crossties of compressed bamboo is described. The system employs a hydraulic press configured to effectively compress multiple stalks of bamboo into a strong unified beam within a mold. Bamboo is first mashed, dried, and treated. A resin is employed as a permanent adhesive, binding the stalks together. The bamboo is stacked within a mold and compressed under the pressure exerted by the hydraulic press. An oven is used to heat the compressed bamboo, and then the bamboo is cooled. The compressed bamboo beam may then be trimmed to remove excess bamboo, and is cut into crosstie segments if needed. The resulting crosstie is sturdy, ecologically friendly, and rapidly manufactured.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TIEBAM INCSAN FRANCISCO CA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Avraham, Jason Pikesville, US 1 3
Johns, David Woodinville, US 8 168
Kouyoumji, Jean-Luc Bordeaux, FR 1 3
Smith, Reuben Seattle, US 1 3
Wang, Patrick Taoyuan, TW 24 205

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00