Switch for gas insulated switchgear, and gas insulated switching device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10453623
APP PUB NO 20180122590A1
SERIAL NO

15559499

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A switch includes: switch blades for multiple phases which perform three-position switching among ON, OFF, and ground, using a rotation shaft; and phase-to-phase connection mechanisms which support the switch blades for the phases so as to be insulated among the phases and against the ground, and which connect the switch blades for the phases and cause them to cooperate with each other. The phase-to-phase connection mechanisms include fitting couplings made of an insulating material and each composed of a large-diameter endless frame body and a small-diameter endless frame body which are fitted to each other. The fitting couplings are arranged on the same axial line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 1008310 ?1008310

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arioka, Masahiro Tokyo, JP 42 291
Inoue, Naoaki Tokyo, JP 19 54
Sano, Koji Tokyo, JP 74 568

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00