Shift register, gate driving circuit containing the same, and method for driving the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10453546
APP PUB NO 20170330633A1
SERIAL NO

15526213

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides a shift register, including: an input circuit, electrically connected to a triggering signal line that provides a triggering signal, a first clock signal line that provides a first clock signal, and a first node; configured for controlling whether the triggering signal is outputted to the first node based on the first clock signal; a control circuit, electrically connected to the first node, a second node, the first clock signal line, a second clock signal line that provides a second clock signal, and a turn-on signal line that provides a turn-on signal, configured for controlling whether the turn-on signal is outputted to the second node; and an output circuit, electrically connected to the first node, the second node, a first signal line that provides a first signal, a second signal line that provides a second signal, and a driving signal output line that outputs a driving signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOE TECHNOLOGY GROUP CO LTDBEIJING

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ma, Zhanjie Beijing, CN 96 674
Sun, Tuo Beijing, CN 86 383

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00