Regulating pressure and harvesting energy as relates to flow meters and metrology hardware

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10451458
APP PUB NO 20180202844A1
SERIAL NO

15407083

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An energy harvester for use in-line with a pipe to harness potential and kinetic energy of fluids flowing therein. Structure for the energy harvester may include a shaft and a blade extending radially therefrom. The shaft can penetrate a housing that operates as a pipe section to install the device in-line with pipe. The shaft can couple with an electrical generator. A load may connect with voltage terminals on the generator so that fluid impinging on the blades will rotate the generator to power the load, effectively harvesting power from the flowing fluid. In one implementation, a load control device that couples with the generator voltage terminals controls a pressure characteristic of the fluid, such as pressure drop, by applying an electrical load on the generator and controllably impeding rotation of the shaft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NATURAL GAS SOLUTIONS NORTH AMERICA LLC16240 PORT NORTHWEST DRIVE HOUSTON TX 77041

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Artiuch, Roman Leon Houston, US 25 192
Gutierrez, Francisco Manuel League City, US 7 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00