Industrial process using a forced-exhaust metal furnace and mechanisms developed for simultaneously producing coal, fuel gas, pyroligneous extract and tar

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10450510
APP PUB NO 20170218275A1
SERIAL NO

15309910

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sealed portable industrial furnace for optimizing the concurrent production of charcoal, fuel gas, pyroligneous extract and tar includes an upright metallic body for receiving wood or biomass. A cover is mounted to the upper end of the upright body and the pressure relief system is incorporated into the cover. A perforated base structure is attached to the lower end of the upright body, and a discharge valve is incorporated into the base structure and is closed during production of the charcoal and then is opened to unload the charcoal produced. A support skirt encircles the base structure to support the body in upright position and defines an expansion chamber for the accumulation of combustion gases generated by the furnace. A series of inlet openings are located along the height of the upright body through which combustion air may be introduced under the action of a control system which receives temperate data from temperature monitoring devices located along the height of the body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOCAIUVA MECANICA LTDA39390-000 BOCAIUVA - MG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
De, Oliveira Vilela Adriana Belo Horizonte, BR 4 0
Pacceli, Da Silva E Souza Thalis Belo Horizonte, BR 4 0
Urbano, Alves José Pirapora, BR 4 0
Vicintin, Ricardo Antônio Belo Horizonte, BR 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00